Pages

28 Ogos 2012

Harga T Beam 40m Panjang

Post Tensioned Prestressed T Beam, Cost T Beam, Harga T Beam 40m,

Post Tensioned Prestressed T Beam, Cost T Beam, Harga T Beam 40m,
Harga T Beam 40m Panjang, Post Tensioned Prestressed Beam.. Susah juga nak lihat dan nak cari harga T Beam untuk bina jambatan. Biasalah kebanyakan kontraktor tak mahu dedahkan harga mereka pada umum. Namun ramai juga yang tak tahu dan ingin tahun kos pembinaan T Beam. Harganya sekitar RM50,000 hingga RM70,000 mengikut lokasi.

T beam di buat di tapak. Dalam tender ia meliputi kos strands,prestressing,launching,grouting and anchorages all in accordance with spec and drawing. Item BQ dinamakan Post Tensioned Prestressed Beam

Menggunakan konkrit grade 40/20 dengan harga RM300 per M3.

Principle of Prestressing

The function of prestressing is to place the concrete structure under compression in those regions where load causes tensile stress. Tension caused by the load will first have to cancel the compression induced by the prestressing before it can crack the concrete. Figure 1.2 (a) shows a plainly reinforced concrete simple-span beam and fixed cantilever beam cracked under applied load. Figure 1.2(b) shows the same unloaded beams with prestressing forces applied by stressing high strength tendons. By placing the prestressing low in the simple-span beam and high in the cantilever beam, compression is induced in the tension zones; creating upward camber.

Figure 1.2(c) shows the two prestressed beams after loads have been applied. The loads cause both the simple-span beam and cantilever beam to deflect down, creating tensile stresses in the bottom of the simple-span beam and top of the cantilever beam. The Bridge Designer balances the effects of load and prestressing in such a way that tension from the loading is compensated by compression induced by the prestressing. Tension is eliminated under the combination of the two and tension cracks are prevented. Also, construction materials (concrete and steel) are used more efficiently; optimizing materials, construction effort and cost.

Tiada ulasan:

Catat Ulasan